| 1. |
Clear obstructions on expressways |
(a)
|
Arrive at reported location of expressway within 1.5 hours upon receipt of a report.
|
95%
|
| (b)
|
Clear obstruction on expressways within 5 hours upon receipt of a report.
|
95%
|
| (c)
|
Clear obstruction on expressways within 8 hours upon receipt of a report.
|
100%
|
| 2. |
Rectification of untidy and unclean roadwork sites |
Rectify all reported untidy and unclean roadwork sites within 3 working days.
|
100%
|
| 3. |
On-site display of the purpose and anticipated completion date of roadworks |
A simple description of roadworks with anticipated completion date will be displayed on site to enable the public to understand the need of the works and when they will be completed. Required for all works where the duration is
longer than 30 calendar days.
|
100%
|
| 4. |
Repair of road surfacing |
(a)
|
Repair of holes in the carriageway, cycle track, and footpath will be completed within 24 hours after receipt of a complaint.
|
95%
|
| (b)
|
Repair of holes in the carriageway, cycle track, and footpath will be completed within 48 hours after receipt of a complaint.
|
100%
|
| 5. |
Repair of traffic signs |
(a)
|
Damaged traffic signs will be repaired within 36 hours after receipt of a complaint.
|
95%
|
| (b)
|
Damaged traffic signs will be repaired within 48 hours after receipt of a complaint.
|
100%
|
| 6. |
Provision of temporary pedestrian facilities where roadworks affect existing pedestrian routes |
Where roadworks affect existing pedestrian routes, temporary pedestrian routes will be provided on-site to minimize inconvenience to users.
|
100%
|
| 7. |
Cleansing of street furniture |
Inspect/cleanse street name plates, traffic signs, directional signs, railings, barriers and planter walls at streets with high traffic flow at least once
per quarter.
|
100%
|
| 8. |
Inspection/clearing of exclusive road drains |
Inspect/clear exclusive road drains at flooding blackspots at monthly intervals between March and October both months inclusive and quarterly intervals for other months.
|
100%
|
| 9. |
Inspection/cleansing of traffic signs and directional signs on expressways |
Inspect/cleanse traffic signs and directional signs on expressways at least twice per year.
|
100%
|
| 10. |
Cleansing of all footbridge structures
|
To maintain footbridge structures in good condition, all footbridges will be cleansed at least once per quarter.
|
100%
|
| 11. |
Cleansing of all subway structures
|
To maintain subway structures in good condition, all subways will be cleansed at least once per quarter.
|
100%
|